We are Hiring
Testing & Commissioning Engineers for KSA.
E&I Division for Oil & Gas, Petrochemical, Utilities and Power Segment.
Job Description:
Testing & Commissioning of MV, HV & EHV Substations, RMU’s, Transformers, Motors, Capacitor Panels & Cables.
Job Requirements:
T&C of Sub-station components (CT, VT, CB, Aux Relays etc.).
T&C of different schemes (Switchgear, GIS & Protection Schemes).
T&C of transformers, Motors, MV/LV cables, Capacitor banks, RTCC/OLTC panels, relay control panels, VFDs, ATS panels, and all kinds of HV/MV/LV substation equipment.
T&C of Basic/Advance Protection Relays will be advantageous.
Working Knowledge of advanced Testing Equipment and Tools.
Diagnose and resolve problems encountered during Testing & Commissioning, ensuring systems function correctly and efficiently.
Create/modify, Red-markup documents and substation drawings, Technical Test report preparations.
Effectively communicate and coordinate project site activities with clients and contractors as needed.
Develop and maintain strong client relationships.
List of Transformers Tests:
1. Winding Resistance Test
2. IR and PI Test
3. Ratio Test
4. Vector Group Test
5. Magnetic Balance Test
6. Core Insulation Test
7. Sweep Frequency Response Analysis
8. Dielectric Frequency Response Analysis
9. Oil Testing:
10. Tan Delta / Power Factor Test (Winding and Bushing)
11. Thermal Imaging (to check hotspots post-loading)
12. Impulse Test (if applicable)
13. Cooling System Functional Test
14. OLTC Operation Test
15. Dynamic Contact Resistance Measurement (DCRM)
16. Motor Current Analysis
17. Tap-to-Tap Transition Timing
18. Partial Discharge Test
19. Induced Overvoltage Test
20. Noise Level Measurement
21. Earth Resistance Test
List of Motors Tests:
1. Insulation Resistance (IR) Test
2. Polarization Index (PI) Test
3. Winding Resistance Test
4. High-Potential (Hi-Pot) Test (MV Motors Only)
5. Surge Test
6. Phase Sequence Test
7. Starting Current Measurement
8. Motor Current Signature Analysis (MCSA)
9. Phase Imbalance Check
List of LV & MV Cable Tests:
1. Visual Inspection
2. Insulation Resistance (IR) Test
3. Phase Sequence and Continuity Test
4. High Voltage Test (VLF or DC Withstand Test)
5. Sheath Continuity and Insulation Test
6. Tan Delta (Dissipation Factor) Test
7. Partial Discharge (PD) Test
8. Earth Continuity Test
9. Cable Routing and Installation Check
10. Length Test
11. Earth Resistance Test
12. Thermography (Infrared Scanning)
Key requirements:
Bachelor of Electrical Engineering.
Experience: 10 to 12 years of experience with a minimum of 10 years in Testing & Commissioning.
Candidates should be passionate, Adaptable, and willing to learn.
Excellent in English and communication skills. Team Leading Skills.
Overseas or Sponsor Transfer.
Please send your CVs to below:
[email protected] , [email protected]